Installing the Barrier involves four main operations: Pile Driving, Joint Flushing, Joint Sealing, and the Quality Assurance & Quality Control program.
Pile Driving
Waterloo Barrier® sheet piles are installed using the same equipment and techniques as conventional products. Vibro equipment is suitable for most soil conditions although better results may be achieved with impact equipment in certain cohesive soils.
![Waterloo Barrier® Sheet Piles Laid Out at a Job Site](https://waterloo-barrier.com/wp-content/uploads/2022/05/PileOfSheetPiles.jpg)
![Pile Driving with Crane-Mounted Vibratory Hammer Pile Driving with Crane-Mounted Vibratory Hammer](https://waterloo-barrier.com/wp-content/uploads/2022/05/PileDriving.jpg)
Joint Flushing & Joint Sealing
Once the piles have been installed to the required depth, the sealable cavities are flushed clean with pressurized water. The cavities are then tremie-grouted with clay-based, cementitious or polymer sealant, depending on the project requirements. Short-term installations can be sealed with an inflatable mechanical system.
![Joint Sealing Joint Sealing](https://waterloo-barrier.com/wp-content/uploads/2022/05/Grouting.jpg)
![Portable Grout Plant Portable Grout Plant](https://waterloo-barrier.com/wp-content/uploads/2022/05/GroutMachine.jpg)
Quality Assurance & Quality Control Program
Potential leak paths through the Barrier are limited to the sealed joints and therefore the joints are the main focus of the quality control procedures. Pile driving, joint flushing and joint sealing operations are documented for each individual sheet pile. The sealable cavity is inspected to verify that it is open along its entire length prior to sealing. Examination by down-hole fibre optic video camera is an option.
![Monitoring of Pile Driving Monitoring of Pile Driving](https://waterloo-barrier.com/wp-content/uploads/2022/05/QA-QCengineer.jpg)
![Inspection of Flushed Joints with Fibre Optic Camera Inspection of Flushed Joints with Fibre Optic Camera](https://waterloo-barrier.com/wp-content/uploads/2022/05/QA-QCengineer2.jpg)