2000 Installations

Site Location Date Consultant/Licensed Installer Area (ft2) Depth (ft) Description
Gas Utility Plant Laconia, NH Jan. 2000 Haley & Aldrich / C3 Environmental 17,680 40 riverbank cut-off wall, heavy WEZ 95 sheet pile.
Moses American Milwaukee, WI Jan. 2000 Roy F. Weston / Slurry Systems 28,800 15-18 cut-off wall to limit migration of creosote contamination into adjacent river.
General Electric Site Phase 3 Pittsfield, MA Jul. 2000 Maxymilian / C3 Environmental 3000 30 cut-off wall riverbank.
Manufacturing Plant Hastings on Hudson, NY Nov. 2000 IT / C3 Environmnetal 12,000 40 cut-off wall to prevent PCB migration into river.
Former Wood Preserving Facility Thunder Bay, ON Oct. 2000 Golder / C3 Environmental 65,000 23-41 cut-off to augment existing clay berm in preventing migration of contaminants into lake.
Canadian Pacific Railway Site Louis, IN Dec. 2000 Slurry Systems 2,900 20-25 cut-off wall along edge of pond adjacent to rail line to halt leakage and resulting wash-out soil embankment.