Site Location Date Consultant/Licensed Installer Area (ft2) Depth (ft) Description
Dow Chemical Site Phase 2 Sarnia, ON Sept. 1997 Dow 35,227 25 cut-off wall along property boundary
Beta Steel Plant Port of Indiana, IN Oct. 1997 Slurry Systems 22,500 42 closed cell and structural wall constructed of new heavy WEZ 95 sheet pile, construction dewatering application.
ICI Site Shawinigan, PQ Dec. 1997 Sanexen / C3 Environmental 17,000 27 cut-off wall to isolate contaminated soils and limit groundwater flow to adjacent waterway
Dover AFB Delaware Dec. 1997 Battele / C3 Environmental 2,442 37 pilot scale Funnel-and-Gate system